Home/Our work/Construction productivity check

Production figures with no extra forms

The inspection register already records what was installed and signed off. Read across a week it gives real quantities — without anyone filling in another sheet.

Access is restricted to registered users.

ClientGNB Energy
What we builtWeekly production report
ReadsSite diaries, timesheets, prestart register
WhereBrisbane and the Gold Coast

See it run

A fortnight of diaries in, real quantities out

No new forms. Press play, or step through it.

divinesoft.com.au/tools/daily-site-check/board/productivity/ Ready
DivineSoft × GNB Energy Production Report Mon 6 – Fri 17 July 2026 · Project 1834

Drop in the period

.pdf diaries · .csv timesheets · .xlsx prestarts Files for the period Waiting
Diaries alone are enough.

Totals

858 mConduit installed
13Pits installed
1Slab
78.0 m/dayAcross 11 days
WorkQuantityEntries
Install Conduits858 m25
Install Pits1313
Install Slabs11

Detail — how each total is made up

Conduit2EC854 m
Conduit2x50mm HD4 m
PitELEC Type 607
PitCOMMS Type 603
PitCOMMS Type 1002
PitELEC Type 31

Illustrative dates. Every figure is one signed-off inspection entry, and a running total written beside a day's figure is never added on.

The diaries the site already files.

The job

Knowing how much went in the ground last week meant someone adding up inspection entries by hand, then arguing about which ones counted. Nobody had time, so it was guessed.

What we built

Drop in a week of site diaries and the report reads every inspection entry: metres of conduit, pits by type and service, daywork sheets referenced. It then cross-checks each day against what the crews wrote in their own diary notes.

The finding is the disagreement

Where the register and the diaries agree, there is nothing to do. Where they do not, that is the finding. Work described but never inspected is not claimable yet. The same length booked on two different days needs confirming before it goes into a claim. An inspection raised with no metres against it counts as zero.

How it turned out

One week produced 385 metres of conduit and five pits across seventeen inspection entries. It also surfaced a Friday where crews recorded 44 metres of work and raised no inspections at all, and a conduit run carrying the same 20 metres on two consecutive days. Neither would have been noticed until the claim.

What comes out

A period on one page

01

Quantities

Metres of conduit, pits by type and service, inspection entries raised, daywork sheets referenced, and conduit per labour hour.

02

Compliance, ranked

Prestarts, diaries and timesheets rolled up by person and by crew, worst first, so repeat gaps rise to the top instead of hiding in five separate days.

03

Exports

A self-contained HTML report that emails and prints cleanly, or a CSV for the spreadsheet. Both carry the same figures as the screen.

Cover of the DivineSoft capability statement
Everything on one document

Download our capability statement

Ten pages covering what we do, what it costs, how we work and who we work with. Handy if you need to show someone else, or you would rather read it later.

PDF · 10 PAGES3 MBUPDATED 2026

Next step

Got something like this?

Tell us what is not working. First chat is free, and if we reckon you do not need us we will say so.